Dec 17
Bid ended

21-1770 MBCI ELEVATED WATER TANK CONTRACT "C" #17256

Choctaw, Mississippi. (T-NR-E)

Status

Bidding Closed

Bid Date 12/17/24 10:00am

Company & Contacts

Willis Engineering
Karl Grubb  
662-226-1081

General Notice

The Mississippi Band of Choctaw Indians (MBCI} (Owner) is requesting Bids for the construction of the following Project: PEARL RIVER WATER TREATMENT PLANT Contract "C" ELEVATED TANK

Bids for the construction of the Project will be received at the Office of Choctaw Utilities located at 258 Industrial Road, Choctaw, MS 39350, until December 17, 2024 at 10:00 a.m. local time. At that time the Bids received will be publicly opened and read.

The Project includes the following Work: ELEVATED TANK, CONTROLS, AND YARD PIPING

Bids are requested for the following Contract: PEARL RIVER WATER TREATMENT PLANT Contract "C" ELEVATED TANK

The Project has an expected duration of 365 Calendar days.

Obtaining the Bidding Documents

Information and Bidding Documents for the Project can be found at the following designated website: www .weiplanroom.com

Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Domestic Preference. This project is subject to the Build America, Buy America Act(BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L 117-58,§ § 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States.

The following waivers apply to this Contract:

BABAA De Minimis, Small Grants, and Minor Components.

This Advertisement is issued by:

Owner: MISSISSIPPI BAND OF CHOCTAW INDIANS

By: Cyrus Ben Title:         
Tribal Chief Date:      

March 26, 2024